Construction debris pricing follows weight on heavy material and volume on light material, so a 4-cubic-yard tile pile can cost more than a 12-cubic-yard lumber pile. Our DuPage County crew quotes both ways and loads the debris, from Naperville subdivisions to century-old Elmhurst two-flats.
| Material | Approx. weight per cubic yard | Typical loaded-and-hauled range |
|---|---|---|
| Drywall scrap (gut job) | 400-550 lb | $180-$320 per 3-4 yards |
| Framing lumber, trim, plywood | 300-400 lb | $200-$350 per 4-5 yards |
| Asphalt shingles (tear-off) | 1,400-1,900 lb | $110-$165 per ton |
Approximate debris weight per cubic yard and typical hauled-away range (DuPage County market ballparks, confirmed on site)